How to use reps in reserve without inflating your estimate

Compare the result from completed reps with a separate estimate based on the reps you think were left.

Open the one rep max calculator →

Write down what you did first

Reps in reserve (RIR) is your judgment of how many additional full repetitions you could have completed at the end of a set. If you did five and think two were left, the log entry is “5 reps, 2 RIR.” The seven-rep figure is an assumption you can explore separately.

One set, three reasonable readings

Suppose you pressed 80 kg for five clean reps and are unsure whether one or two remained. Using the Epley equation gives the following scenarios.

ScenarioReps put into the equationEstimated 1RM
Completed reps alone593.3 kg
Assume one rep remained696.0 kg
Assume two reps remained798.7 kg

Keep an uncertain rating visible

When you cannot judge the final rep confidently, leave RIR unrated and preserve the completed set. An unrated set and a set rated 0 RIR mean different things. Zero means you believe another full rep was unavailable.

Researchers asked 24 resistance-trained people to call out when they believed they had one or three reps left on bench press at 75% of measured 1RM. Their estimates were close on average, with individual error. A number from that protocol is no guarantee for a different lift or person.

Keep the same convention next time

For a weekly comparison, use completed-rep estimates throughout, or compare estimates adjusted using the same RIR convention throughout. Label a switch in convention in your log. In the example, the two assumptions differ by about 5.3 kg before display rounding, even though the underlying lift never changed.

Sources

Browse all guides →